


|
INTERNATIONALSPACESTATION HOMEPAGE |
|
STS-118 ASSEMBLY FLIGHT USA |
|
LAUNCH : |
|
22.36 GMT |
|
Kennedy Space Center |
|
Florida / USA |
|
Pad 39 A |
|
Aug.11 / 2007 |
|
LAUNCH VEHICLE: |
|
Space Shuttle ENDEAVOUR |
|
EVA: |
|
# 1 : |
|
06 h 17 min |
|
Endeavour's STS-118 mission was
NASA's second shuttle flight dedicated to ISS construction in2007 and
features up to four spacewalks to attach the new Starboard 5 (S5) truss
and other hardware to the station's exterior. The small spacer truss, S5 is
serving as the bridge between the stations newly-installed starboard
solar arrays and a new pair of solar wings set to launch in2008.
Endeavour's crew was also delivering an external spare parts platform
for the ISS and replaced a broken gyroscope in the outpost's U.S.
attitude control system. station. |
|
I.S.S.ELEMENT: |

|
LANDING : |
|
Aug.21 / 2007 |
|
16.32 GMT |
|
Runway 15 |
|
Kennedy Space Center / Fl. |
|
3rd starport truss segment |
|
Aug.13 / 2007 |
|
# 2 : |
|
06 h 28 min |
|
Aug.15 / 2007 |
|
# 3 : |
|
05 h 28 min |

|
August.08 / 2007 |
|
8.30.07 |
|
18:40:56 |
|
This websource is designed by Michael May copyright 1999-2007 |


|
MANNED SPACE FLIGHT 1990īs 2000īs |
|
>>> |
|
<<< |
|
13A.1 |


|
Aug.18 / 2007 |
|
# 4 : |
|
05 h 02 min |

|
I.S.S. and Endeavour after undocking |




