10.16.05

15:53:07

This websource is designed by      Michael May     copyright 1999-2005

INTERNATIONALSPACESTATION    HOMEPAGE

STS-105                               ASSEMBLY FLIGHT                       USA

LAUNCH :

Aug.10 / 2001

21.10 GMT

Kennedy Space Center

Florida / USA

Pad 39 A

Aug.16 / 2001

LAUNCH VEHICLE:

Space Shuttle   DISCOVERY

EVA:

# 1 :

06 h 16 min

Multipurpose Logistics Module


Space Shuttle Discovery crew delivered and installed temoprarily the italian multi-purpose module LEONARDO including tons of equipment and supplies.


Another important goal of the mission was the replacement of the station crew and the beginning of

EXPEDITION THREE.

7A.1

I.S.S.ELEMENT:

UP

LANDING :

Aug.22 / 2001

18.23 GMT

Runway 15

Kennedy Space Center / Fl.

Progress M1-6

P6-Truss

EXPEDITION 3

DOWN

EXPEDITION 2

Aug.18 / 2001

# 2 :

05 h 29 min

ZVEZDA

DESTINY

LEONARDO  MPLM

Aug.13 / 2001

MPLM-TIMELINE:

docking :

15.54 GMT

Aug.19 / 2002

undocking :

18.15 GMT

ZARYA

MANNED SPACE FLIGHT    1990īs   2000īs   

>>>

<<<